Last week the initial concrete pour of the footings was completed. This is a big week to get ready for the concrete pour on Thursday, June 14th. After the footings were poured, the entire slab area was filled with 6″ of gravel, then black plastic vapor barrier placed on top and finally a web of steel reinforcing bar. All this … Read More