Construction

Exterior Stucco Prep Begins and We’re Getting All Wired Up!

Following a break for the holidays, the crew is back in full force and attacking the project on many fronts! The exterior is being prepared for the application of the stucco. This is a long process of several months as there are three coats of material to be applied to create the final stucco finish. Each coat has to be … Read More

Construction

Roof is complete, mechanical, electrical and sprinklers proceeding…

The blue metal roof is installed on the Temple and the building is now weathered in. All the interior infrastructure is proceeding with mechanical & sprinkler rough-ins finishing up this week. The electrical rough-in (installing all the wires to switches and fixtures) is moving forward with many hands on deck. The final piece of the puzzle to complete before the … Read More

Construction

Cupola Is Up, Interior Is Framed, and Blue Metal Roof Is Being Installed!

We’re firing on all cylinders now… many things are happening on multiple fronts at the Temple of Light. We were fortunate to get the cupola installed just days before our first big rain of November. So now we are moving forward with many different trades on the interior and exterior. The interior wood framing is almost complete, with the altar, … Read More

Construction

The Journey of the Cupola — from Seattle to the Top of the Temple of Light!

The cupola was manufactured in Seattle by the same company that built the cupola for the Ananda Washington Temple. It was constructed over the summer, then crated and transported to Ananda Village in September. The  cupola was installed on Friday, November 16, 2018. What a joy to see the cherry on top!! Excellent work by the crew, the crane, and … Read More

Construction

Temple of Light Construction Update

The Temple of Light is moving forward on all fronts simultaneously! There are many divergent teams of workers making great steps forward as they install many of the “behind the scenes” utilities such as drainage, septic system, plumbing, electrical and exterior framing details. Ananda Village and California have not had any significant rain this fall, which is to the detriment … Read More

Construction

Temple of Light — Well On Our Way!

The Ananda Temple of Light is proceeding “all ahead full!” The wood framing is mostly complete and we have all the other trades putting their systems into the building. This includes sprinklers, plumbing, heating/cooling and electrical. It’s quite a beehive of activity with many tradesmen on site making it all happen in a harmonious manner. We have also been blessed … Read More

Construction, The Project

Getting Ready for the BIG POUR

Last week the initial concrete pour of the footings was completed. This is a big week to get ready for the concrete pour on Thursday, June 14th. After the footings were poured, the entire slab area was filled with 6″ of gravel, then black plastic vapor barrier placed on top and finally a web of steel reinforcing bar. All this … Read More

Construction, News, The Project

May 2018 – Temple Foundation Underway!

The Temple of Light is officially underway as the builders have started the foundation work for the structure. In May, the trenches were dug for footings and for all under-slab piping. The first concrete was poured on June 1st as the interior footings received concrete in preparation for the “Big Pour.” On June 14th, the entire slab of 11,097 square … Read More

Construction

Temple Site Graded, Graveled, Strawed… ready for winter!

The Temple grading is completed and the site is ready for the winter rains – bring it on! The initial layers of gravel were placed over the entire parking area, all 153 spaces, including the circular drive at the Temple entry. The areas where the soil was disturbed has been covered in straw and hydro-seeded as needed. There is some … Read More

Construction

Temple Grading & Parking Nearly Complete

The grading for the Temple and parking has been proceeding as expected and is nearly complete as of today. The biggest part of the job was to cut the grade at the Temple building site and use it to fill the immense valley which separated the Temple from the new parking area, which is north of the Temple near the … Read More