What a busy week…. 6 subcontractors working harmoniously to make it all happen! The cupola arrived on Monday and will be installed after the tile dome is completed. Concrete was poured inside the Mandir, at steps into the lower crypt and into the block walls at Swamiji’s Garden. The dome was readied for tile and the exterior walls readied for stucco. The hydronic floor is in and the rough electrical is installed……. whew!  Next week, insulation, tile, stucco and sheet rock begins!!