The Dawn of the Pour

The Dawn of the Pour

It was a busy and satisfying week as we poured the slabs on both the upper and lower levels, stripped the form boards off the foundation walls and began the framing!  Great job by the concrete specialists to get it all done on an incredibly hot day! The carpenters have taken over the site and are making it all come together.
The Mandir is starting to take shape!  By the end of next week we will have the walls all framed and sheared, and the arched glu-lam beams in place – now that will be a sight!